§ 13.08.010. Definitions. |
§ 13.08.020. Sewer connections. |
§ 13.08.030. Installation of STEF, STEP or sewage ejector pump system. |
§ 13.08.040. Sewer application and inspection fees. |
§ 13.08.050. Construction sites. |
§ 13.08.060. Inspections. |
§ 13.08.070. Separation of storm and sanitary sewer. |
§ 13.08.080. Regulation of drainage. |
§ 13.08.090. Deposits in sewers. |
§ 13.08.100. Sewer rate charges. |
§ 13.08.110. Violations—Penalties. |